The Rebuild Downtown construction project is going well. Current Work Week (May 13, 2024) Demolition along 18th St. Demolition along 2nd Ave. Water main installation 2 Week Look Ahead (May 20, 2024) Water main installation and testing Traffic Control 18th St. from 1st...

Work is underway for the Rebuild Downtown Rock Island project. The slide deck from the April 10 pre-construction meeting outlines the entire project, including parking plans, and this information sheet was handed out at the meeting. [embed]https://www.youtube.com/watch?v=FyviAM4h_s4&t[/embed] Project Location, Phases & Important Dates Phase...